Adopt Swift Testing in ConnectionPoolTests (#588) #1522
test.yml
on: push
api-breakage
0s
Matrix: linux-integration-and-dependencies
Matrix: linux-unit
Matrix: macos-all
Annotations
6 errors
linux-integration-and-dependencies (postgres:13)
Process completed with exit code 1.
|
linux-integration-and-dependencies (postgres:17)
The operation was canceled.
|
linux-integration-and-dependencies (postgres:17)
Canceling since a higher priority waiting request for CI-refs/heads/main exists
|
linux-integration-and-dependencies (postgres:15)
The operation was canceled.
|
linux-integration-and-dependencies (postgres:15)
Canceling since a higher priority waiting request for CI-refs/heads/main exists
|
CI
Canceling since a higher priority waiting request for CI-refs/heads/main exists
|