Skip to content

Updates configuration for rubocop up to 1.81.0 #1044

Updates configuration for rubocop up to 1.81.0

Updates configuration for rubocop up to 1.81.0 #1044

Triggered via push September 9, 2025 18:42
Status Failure
Total duration 21s
Artifacts

test.yml

on: push
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

9 errors
test (3.3)
The process '/opt/hostedtoolcache/Ruby/3.3.8/x64/bin/bundle' failed with exit code 16
test (3.2)
The process '/opt/hostedtoolcache/Ruby/3.2.8/x64/bin/bundle' failed with exit code 16
test (3.2)
The strategy configuration was canceled because "test._3_3" failed
test (3.0)
The process '/opt/hostedtoolcache/Ruby/3.0.7/x64/bin/bundle' failed with exit code 16
test (3.0)
The strategy configuration was canceled because "test._3_3" failed
test (3.1)
The operation was canceled.
test (3.1)
The strategy configuration was canceled because "test._3_3" failed
test (3.4)
The operation was canceled.
test (3.4)
The strategy configuration was canceled because "test._3_3" failed