Skip to content

chore(deps): update dependency https://github.com/dafyddj/copier-ssf-…

dde8b27
Select commit
Loading
Failed to load commit list.
Merged

chore(deps): update dependency https://github.com/dafyddj/copier-ssf-ci to v2 #140

chore(deps): update dependency https://github.com/dafyddj/copier-ssf-…
dde8b27
Select commit
Loading
Failed to load commit list.
coqbot-app / GitLab CI job rockylinux-9-master (pull request) completed Jun 9, 2025 in 0s

Test has failed on GitLab CI

This job is allowed to fail.

We show below the last 40 lines of the trace from GitLab (the complete trace is available here).

Details

            Started: 20:01:42.592172
           Duration: 26.323 ms
            Changes:   
              ----------
              pid:
                  1090
              retcode:
                  0
              stderr:
              stdout:
       ----------
                 ID: postfix-init-service-running-postfix
           Function: service.running
               Name: postfix
             Result: True
            Comment: Service postfix has been enabled, and is in the desired state
            Started: 20:01:42.618863
           Duration: 217.693 ms
            Changes:   
              ----------
              postfix:
                  True
       
       Summary for local
       -------------
       Succeeded: 29 (changed=28)
       Failed:     2
       -------------
       Total states run:     31
       Total run time:   13.046 s
>>>>>> ------Exception-------
>>>>>> Class: Kitchen::ActionFailed
>>>>>> Message: 1 actions failed.
>>>>>>     Converge failed on instance <default-rockylinux-9-master>.  Please see .kitchen/logs/default-rockylinux-9-master.log for more details
>>>>>> ----------------------
>>>>>> Please see .kitchen/logs/kitchen.log for more details
>>>>>> Also try running `kitchen diagnose --all` for configuration
Cleaning up project directory and file based variables
ERROR: Job failed: exit code 1