Skip to content

WIP Checkpoint

WIP Checkpoint #3459

Triggered via push September 5, 2025 02:27
Status Failure
Total duration 10m 47s
Artifacts

ci.yml

on: push
Matrix: clang-sanitizers
Matrix: linux-compat
Matrix: linux-compiler-compat
Matrix: macos-debug
Matrix: macos-secitem
Matrix: macos
Matrix: windows-vc17
Fit to window
Zoom out
Zoom in

Annotations

58 errors
macos-debug (dispatch_queue, ,thread)
Process completed with exit code 1.
macos (dispatch_queue, ,thread)
Process completed with exit code 1.
macos-debug (kqueue, ,thread)
Process completed with exit code 1.
macos-secitem (,address,undefined)
Process completed with exit code 1.
macos-debug (dispatch_queue, ,address,undefined)
Process completed with exit code 1.
macos (kqueue, ,thread)
Process completed with exit code 1.
macos (kqueue, ,address,undefined)
Process completed with exit code 1.
macos-secitem (,thread)
Process completed with exit code 1.
macos (dispatch_queue, ,address,undefined)
Process completed with exit code 1.
macos-debug (kqueue, ,address,undefined)
Process completed with exit code 1.
macos-x64
Process completed with exit code 1.
linux-compat (manylinux1-x64)
Process completed with exit code 1.
linux-compat (manylinux2014-x64)
Process completed with exit code 1.
linux-compat (manylinux2014-x86)
Process completed with exit code 1.
linux-compat (manylinux1-x86)
Process completed with exit code 1.
linux-compat (rhel8-x64)
Process completed with exit code 1.
windows-debug
Process completed with exit code 1.
linux-compat (opensuse-leap)
Process completed with exit code 1.
windows-shared-libs
Process completed with exit code 1.
windows
Process completed with exit code 1.
windows-vc17 (x86)
Process completed with exit code 1.
freebsd
The process '/usr/bin/ssh' failed with exit code 1
windows-vc17 (x64)
The operation was canceled.
windows-vc17 (x64)
The strategy configuration was canceled because "windows-vc17.x86" failed
windows-app-verifier
Process completed with exit code 1.
linux-compiler-compat (gcc-7)
Process completed with exit code 1.
linux-shared-libs
Process completed with exit code 1.
linux-compiler-compat (clang-11)
The operation was canceled.
linux-compiler-compat (clang-11)
The strategy configuration was canceled because "linux-compiler-compat.gcc-7" failed
linux-compiler-compat (clang-8)
The operation was canceled.
linux-compiler-compat (clang-8)
The strategy configuration was canceled because "linux-compiler-compat.gcc-7" failed
linux-compiler-compat (gcc-6)
The operation was canceled.
linux-compiler-compat (gcc-6)
The strategy configuration was canceled because "linux-compiler-compat.gcc-7" failed
linux-compiler-compat (clang-10)
The operation was canceled.
linux-compiler-compat (clang-10)
The strategy configuration was canceled because "linux-compiler-compat.gcc-7" failed
linux-compiler-compat (gcc-4.8)
The operation was canceled.
linux-compiler-compat (gcc-4.8)
The strategy configuration was canceled because "linux-compiler-compat.gcc-7" failed
linux-compiler-compat (clang-6)
The operation was canceled.
linux-compiler-compat (clang-6)
The strategy configuration was canceled because "linux-compiler-compat.gcc-7" failed
linux-compiler-compat (clang-15)
The operation was canceled.
linux-compiler-compat (clang-15)
The strategy configuration was canceled because "linux-compiler-compat.gcc-7" failed
linux-compiler-compat (gcc-13, --cmake-extra=-DCMAKE_EXE_LINKER_FLAGS="-lresolv")
The strategy configuration was canceled because "linux-compiler-compat.gcc-7" failed
linux-compiler-compat (clang-9)
The operation was canceled.
linux-compiler-compat (clang-9)
The strategy configuration was canceled because "linux-compiler-compat.gcc-7" failed
linux-compiler-compat (gcc-8)
The operation was canceled.
linux-compiler-compat (gcc-8)
The strategy configuration was canceled because "linux-compiler-compat.gcc-7" failed
linux-compiler-compat (clang-17)
The operation was canceled.
linux-compiler-compat (clang-17)
The strategy configuration was canceled because "linux-compiler-compat.gcc-7" failed
linux-compiler-compat (gcc-11)
The operation was canceled.
linux-compiler-compat (gcc-11)
The strategy configuration was canceled because "linux-compiler-compat.gcc-7" failed
linux-compiler-compat (gcc-5)
The operation was canceled.
linux-compiler-compat (gcc-5)
The strategy configuration was canceled because "linux-compiler-compat.gcc-7" failed
downstream
Process completed with exit code 1.
openbsd
The process '/usr/bin/ssh' failed with exit code 1
clang-sanitizers (,thread)
Process completed with exit code 1.
linux-debug
Process completed with exit code 1.
clang-sanitizers (,address,undefined)
Process completed with exit code 1.