Increase invisible heap size for melonDS by 128MiBs #2185
ci.yml
on: push
Build solution with analyzers
16s
Build and package output
16s
Matrix: Test
Annotations
9 errors and 1 notice
Build solution with analyzers
The operation was canceled.
|
Build solution with analyzers
Canceling since a higher priority waiting request for Build and test main solution-refs/heads/master exists
|
Test (Windows, windows-latest)
The operation was canceled.
|
Test (Windows, windows-latest)
Canceling since a higher priority waiting request for Build and test main solution-refs/heads/master exists
|
Build and package output
The operation was canceled.
|
Build and package output
Canceling since a higher priority waiting request for Build and test main solution-refs/heads/master exists
|
Test (Linux, ubuntu-22.04)
The operation was canceled.
|
Test (Linux, ubuntu-22.04)
Canceling since a higher priority waiting request for Build and test main solution-refs/heads/master exists
|
Build and test main solution
Canceling since a higher priority waiting request for Build and test main solution-refs/heads/master exists
|
Test (Windows, windows-latest)
The windows-latest label will migrate from Windows Server 2022 to Windows Server 2025 beginning September 2, 2025. For more information see https://github.com/actions/runner-images/issues/12677
|