Skip to content

Bump actions/checkout from 4 to 6 #11

Bump actions/checkout from 4 to 6

Bump actions/checkout from 4 to 6 #11

Triggered via push November 24, 2025 06:40
Status Failure
Total duration 15m 19s
Artifacts

unit.yml

on: push
Matrix: test-linux
Fit to window
Zoom out
Zoom in

Annotations

5 errors
test-linux (8.1)
Process completed with exit code 1.
test-linux (8.4)
Process completed with exit code 1.
test-linux (8.3)
Process completed with exit code 1.
test-linux (8.2)
The job has exceeded the maximum execution time of 15m0s
test-linux (8.2)
The operation was canceled.