Update MQ connector to support Skill API #182
unit_tests.yml
on: pull_request
py_build_tests
/
py_build_tests
9s
py_build_tests
/
relative_path_tests
7s
docker_build_tests
/
docker_build_tests
38m 47s
Matrix: unit_tests
Annotations
7 errors
unit_tests (3.12)
Process completed with exit code 1.
|
unit_tests (3.9)
The operation was canceled.
|
unit_tests (3.9)
The strategy configuration was canceled because "unit_tests._3_12" failed
|
unit_tests (3.10)
The operation was canceled.
|
unit_tests (3.10)
The strategy configuration was canceled because "unit_tests._3_12" failed
|
unit_tests (3.11)
The operation was canceled.
|
unit_tests (3.11)
The strategy configuration was canceled because "unit_tests._3_12" failed
|
Artifacts
Produced during runtime
Name | Size | Digest | |
---|---|---|---|
util-test-results-3.12
|
584 Bytes |
sha256:801e0d01598207559165156ea07b31caaf904879ea8b80231a3eebc121cbfa14
|
|
util-test-results-3.9
|
575 Bytes |
sha256:99ba432950a8ea9e1f0b2d1a1da9ace05a79b0d4aed0824c9f37a5984c305334
|
|