Skip to content

add PPA for gcc9

add PPA for gcc9 #962

Triggered via push June 22, 2025 09:58
Status Failure
Total duration 36s
Artifacts

build.yml

on: push
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

6 errors
build (3.11)
Process completed with exit code 1.
build (3.10)
Process completed with exit code 1.
build (3.13)
Process completed with exit code 1.
build (3.13)
The strategy configuration was canceled because "build._3_11" failed
build (3.12)
The operation was canceled.
build (3.12)
The strategy configuration was canceled because "build._3_11" failed